Learn more about ECCS INS
We're built for utility-scale work — typically 5 MW to 500 MW+ single-axis tracker and fixed-tilt sites. We've installed over 1 GW since 2015 and can scale crews to match your construction schedule.
Pile installation (driving, refusal mitigation, surveying), racking assembly for all major tracker OEMs, and module installation including torquing and QA/QC. We can take one scope or the full mechanical package.
Headquartered in Wilson, NC, we mobilize crews across the Southeast and beyond. Our fleet and travel teams can be on a new site within days.
100% of our field staff are OSHA-trained. We run daily JSAs, weekly toolbox talks, and maintain a zero lost-time incident record across recent projects.
For most projects we can have a lead crew on site within 1–2 weeks of contract execution, with full ramp following shortly after.
We're open-shop and can work alongside union trades. We staff with experienced foremen and long-tenured crews to keep quality consistent across every shift.
From our Wilson, NC base we mobilize crews to projects throughout the region — and the impact compounds with every megawatt installed.